The K-Zone: A porch too far: Making good

The boring bit

In fact there wasn't much work to be done after the job. I had to replace the block paving around the new porch, making use of the blocks I removed at the start. Then I re-grouted the paving with fine sand, to reduce (I hope) the likelihood of it moving around. The last job was to tidy up and have the rubbish collected.

Approximate costs

Waste removal (Hippobag) £50
All other materials left over from earlier work


Total £50

Next: closing remarks